Knowledge

Keyword: System Scenarios

book

System Architecture and Scenario Development: For existing and future energy system at Port of Hirtshals

Birgitte Bak-Jensen , Jayakrishnan Radhakrishna Pillai, Amjad Anvari-Moghaddam , Sina Ghaemi , Mikkel Bendixen Copeland, Anders Wittendorff, Anders Sulbæk, Mette Dam Jensen, Hanne Skovby, Lotte Holmberg Rasmussen, Per Hylle, Per Alex Sørensen, Lars Reinholdt & Anders Andersen

This report includes a broad description of the findings from work package 2 in the EFFORT project and is made as the fulfillment of delivery L2.1 in the project. First an overall description of the Port of Hirtshals together with its infrastructure is given in chapter 1 together with some background aspect for the development of the Port of Hirtshals. In this chapter also the 5 companies who had shown their interest in participation in the project are described in more detail. Based on this as outcome of task 2.1 and described in chapter 2 an overall system architecture is set up for the existing industries at the Port of Hirtshals and next for the future expansion of the port. Based on the overall system architecture an adaptation of the system to the EU SGAM model is performed and explained. Then the overall set up of the data hub is briefly introduced, to see how it is related to the overall energy system set up. The final part documented for task 2.1 is two examples of sequence diagrams for first the processes in Forskerparken and next one which is valid for both the Fish Terminal, Lineage as well as Danish Salmon, since many of their electrical consuming processes here in an overall manner look the same.

In chapter 3 the base scenarios for the existing industries at Port of Hirtshals are set up. This is done based on information and wishes from the industries and the local Distribution System Operator (DSO), which is gained partly by bilateral discussions as well as on a workshop held with all the involved industries present at the same time. The scenarios will be described according to the IEC standard 62559-2, to ensure better utilization of the ideas in other projects, by applying a standard template known in this area.

Finally, in chapter 4 scenarios for the future expected extension of industries and activities at the Port of Hirtshals are set up. This is based on inputs from GPN, HH, NEN as well as Hjørring Municipality, Hirtshals Fjernvarme and from inputs from workshops with the existing industries at the port. Also here the IEC 62559-2 standard will be applied when describing the use cases.

The scenarios set up will later be used for the further development of the data hub, which is to be set up in the project, as well as for the model set up and control perspectives in the later WPs.

Elforsk / 2024
Go to book